Getting the house sealed up so the inside work could start was the big activity for Q4. Firstly, the roof and windows were installed. Then the ground floor concrete slab was poured. Finally a temporary front door was installed and a portable propane heater was used to bring the inside temperature up to a comfortable level.
What’s Ahead
Getting the plans together for the HVAC systems is the main focus for early Q1 2020.