House Build Progress Q1/Q2 2020

Work on the house was progressing well up until March 2020 when the various construction site restrictions due to the COVID-19 outbreak kicked in. A skeleton crew continued to work over this period but progress slowed considerably.

Several big items did get finished: the pouring and finishing the concrete floor throughout the house, the rough plumbing, the garage door and the elevator. Externally, the majority of the siding was installed.

What’s Ahead

We are hoping with restrictions easing in Ontario that the house can be completed so we can take occupancy in September. Electrical and HVAC rough-ins need to be completed before the interior finishing (drywall, painting, kitchen and bathroom installations) can start.