House Build Progress Q4 2019

The big activity in Q4 2019 sealing up the house sealed up so the inside work could start. The roof and windows were installed and the ground floor concrete slab was poured. A temporary front door was installed and a portable propane heater used to bring the inside temperature up to a comfortable leve.

What’s Ahead

Framing the interior walls and getting the plans together for the HVAC systems are the main focus for early Q1 2020.